Full Title: 2020 Local Streets Renewal Program: Blackwater Bay, Drake Boulevard and Various Other Locations
The Work to be done under the Contract shall consist of two parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Manitoba Hydro Funded Work
Part 1 – City Funded Work
D2.2 Part 1 – City Funded Work shall consist of:
(a) Asphalt Pavement Reconstruction
(i) Blackwater Bay from Charing Cross Crescent to Blackwater Bay
(ii) Fleury Place from Fontaine Crescent to Fontaine Crescent
(iii) Rosewarne Avenue from Kingston Row to St. Mary’s Road
(iv) Kingston Row from Rosewarne Avenue to Kingston Row
(b) Pavement Rehabilitation
(i) Blackwater Bay from Charing Cross Crescent to cul de sac end
(ii) Drake Boulevard from Cottonwood Road to Autumnwood Drive
(iii) Oakridge Bay from Metz Street to Metz Street
Part 2 –Manitoba Hydro Funded Work
D2.3 Part 2 – Manitoba Hydro Funded Work shall consist of:
(a) Street Lighting and Associated Works
(i) Blackwater Bay from Charing Cross Crescent to Blackwater Bay
(ii) Fleury Place from Fontaine Crescent to Fontaine Crescent
(iii) Rosewarne Avenue from Kingston Row to St. Mary’s Road
D2.4 The City currently has no approved funding in the Capital Budget for Part 2 of the Work, but is
anticipating receiving notification about funding from Manitoba Hydro by the Award Date. Part 2
of the Work is contingent upon Manitoba Hydro approving sufficient funding.
D2.4.1 Further to C7.1, if notice of sufficient funding is not received, the City shall have the right to
eliminate all or any portion of Part 2, and the Contract Price will be reduced accordingly.
D2.4.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to D2.4.1
shall not be considered in calculating the aggregate reduction in the Contract Price for
purposes of C7.5.
D2.4.3 If all or any portion of Part 2 is eliminated pursuant to D2.4.1, the time periods stipulated in
D19 for Substantial Performance of the Work and in D20 for Total Performance of the
Work will be reduced proportionally by the Contract Administrator acting reasonably.
D2.5 The major components of the Work are as follows:
(a) Asphalt Pavement Reconstruction:
(i) Pavement Removal;
(ii) Excavation;
(iii) Placement of suitable site sub base material as required
(iv) Placement of geotextile fabric;
(v) Placement of geogrid;
(vi) Insulation of water services;
(vii) Subgrade compaction;
(viii) Placement of sub-base and base course material;
(ix) Installation of Catch Basin and connecting pipes;
(x) Installation of subdrains;
(xi) Construction of barrier curb for asphalt pavements – A utilizing slip form paving
equipment for Blackwater Bay and Fleury Place;
(xii) Construction of barrier curb for asphalt pavements – A utilizing slip form paving
equipment for Kingston Row and Rosewarne Avenue;
(xiii) Construction of modified barrier for asphalt pavements;
(xiv) Construction of lip curb for asphalt pavements;
(xv) Construction of ramp curb for asphalt pavements;
(xvi) Placement and compaction of 50mm sub-base material as backfill behind barrier
curb for asphalt pavement within excavated area;
(xvii) Placement and compaction of suitable site material as backfill behind barrier curb for
asphalt pavement within excavated area;
(xviii) Installation of 150mm reinforced approach;
(xix) Sidewalk Renewal;
(xx) Installation of detectable warning surface tiles;
(xxi) Adjustment of precast sidewalk blocks
(xxii) Placement of asphalt pavement (Type III, 70mm thickness);
(xxiii) Placement of asphalt pavement (Type 1A, 50mm thickness);
(xxiv) Adjustment of existing catch basins, manholes and appurtenances;
(xxv) Boulevard restoration and sod;
(xxvi) Street lighting improvement and associated works.
(b) Rehabilitation:
(i) Planing of existing asphalt as required;
(ii) Renewal of existing sidewalk as required;
(iii) Construction of concrete sidewalk;
(iv) Installation of detectable warning surface tiles;
(v) Milling of existing lip curb (Blackwater Bay);
(vi) Installation of catch basin/catch pits and connection pipe;
(vii) Abandon existing drainage inlets;
(viii) Installation of catch pits and drainage connection pipes;
(ix) Full-depth concrete repairs of existing joints and slabs;
(x) Renewal of existing curb as required;
(xi) Construction of modified barrier curb;
(xii) Adjustment of precast sidewalk blocks;
(xiii) Adjustment of existing catch basins, manholes and appurtenances;
(xiv) Placement of pavement repair fabric as required;
(xv) Placement of asphalt overlay;
- Drake Boulevard from Autumnwood Road to Cottonwood Road (average
- thickness 85mm)
- Blackwater Bay from Charing Cross Crescent to cul de sac end (average
- thickness 80mm)
- Oakridge Bay from Metz Street to Metz Street (average thickness 80mm)
(xvi) Boulevard restoration and sod.